Completed in 2023, Waimarie is Lincoln University’s new 9,450m² three-storey science facility, replacing former earthquake-damaged science buildings. Designed by Warren and Mahoney and constructed by Leighs Construction, the building provides state-of-the-art learning and research spaces where science is intentionally placed on display, creating opportunities for collaboration, discovery and innovation.
To support the building’s sustainability objectives and long-term performance requirements, more than 2,000m² of EQUUS SOPREMA DUOTHERM Warm Roof System was installed across multiple roof areas. The project showcases the adaptability of the DUOTHERM system across a variety of substrates while contributing to thermal efficiency, condensation control and long-term waterproofing performance.
The facility officially opened in September 2023 and has since received significant international and national recognition, including winning the Higher Education & Research – Completed Buildings category at the 2024 World Architecture Festival Awards and the 2024 Te Kāhui Whaihanga New Zealand Institute of Architects Canterbury Architecture Award – Education.