News & Updates

Christmas Hours 2021

Equus Industries Ltd Head Office will close 4.00pm Wednesday 22nd December 2021 and re-open 7.30am Wednesday 5th January 2022. Auckland, Wellington, and Christchurch branches will close 12pm Thursday 23rd December 2021. Auckland and Wellington branches re-open 7.30am 10th January 2022 and Christchurch branch re-open 8am 10th January 2022. Thank you for your continued support throughout [...]

New Product: COLPHENE 3000

We are pleased to be launching a new product in the Equus SOPREMA line of bitumen tanking membranes, COLPHENE 3000 by SOPREMA. Equus SOPREMA COLPHENE 3000 system is a self-adhesive tanking membrane manufactured by worldwide leader in waterproofing products, SOPREMA. The membrane is designed for foundation walls and other below grade vertical surfaces and can [...]

Project: South Brighton Surf Club

Project: South Brighton Surf Lifesaving Club Equus Certified Applicator: H2 OFF Ltd Location: South New Brighton, Christchurch Opened: 2021 The South Brighton Surf Club, formed in 1929, has had multiple renovations over its lifetime but this latest rebuild was determined by the Canterbury 2011 earthquakes. The building suffered several major structural and aesthetic issues, and [...]