New Masterspec Work Section! Our tech team have been working hard behind the scenes on the ongoing launch of our new Equus Soprema Flagon TPO! The latest feature to be added is our newest Masterspec work section - 4422EF Equus Soprema Flagon TPO Waterproofing Membrane - which we released in August 2020. This work section [...]
EQUUS ARCHIVES: The Church of the Good Shepherd is the sole church in Lake Tekapo, New Zealand. It was designed by Christchurch architect R.S.D Harman and opened in 1935. During the construction of the church, the builders were instructed that the site was left undisturbed, including the Matagouri bushes and rocks. Originally the roof was [...]
Last month here at Equus we had a special Milestone reached! Nikki Brown, Equus Industries Financial Control Director, celebrated her 30th year with the company. This is a wonderful achievement for Nikki and the Equus team would like to congratulate her on her anniversary, we are lucky to have a dedicated Director as one of [...]
May brought a sense of positivity and forward movement throughout New Zealand as our country transitioned from Level Three to Level Two and we were feeling it at Equus. Our team was filled with good energy as we got back into the swing of things reconnecting with one another, sharing stories of our lockdowns and [...]